Nettle fiber- test results

Tradycyjna roślina włóknista

 

The results of research on the most effective way to obtain fiber from our Polish nettle Urtica dioica.

Collecting nettles – 13 hours

The total working time until obtaining the fiber ready for spinning: 103.6 hours

Spinning: 17 hours, splitting 2 hours

Washing of yarn, drying, etc: 3hours

Weaving: 26 hours (weaving loom and weaving)

Working time 165 hours.

I got the most beautiful nettle fiber from the soaked nettles, it was strong and shiny, although it was relatively small amount.

The most efficient method turned out to be  retting, about 4 weeks.

Acquiring fiber from green nettle, although the fastest at the fiber removal stage – still required a lot of action, and the fiber itself was very delicate, making it more difficult to spin.

                   
Nr Nettle weight place How prepared time to prepare the fiber (hours) Fiber weight yield:fiber weight / nettle weight before preparation efficiency: yield / time Quality, scale of 0-5 quality * efficiency
                   
1Z 1130 gorge near the house boiled in soap petals 3 20 1,77 0,59 1 0,59
1R 1130 gorge near the house retting 3 weeks 3 17 1,50 0,50 2 1,00
1M 1130 gorge near the house soaking 3 days 3 18 1,59 0,53 4 2,12
2R 720 near the road retting 2 weeks 2,8 11 1,53 0,55 3 1,64
2M 730 near the road soaking 4 days 3 9 1,23 0,41 5 2,05
2Z 600 refinery boiling in ash 2x2hours 3 14 2,33 0,78 3 2,33
3R 2000 field retting 4 weeks 4 44 2,20 0,55 4 2,20
4R 1062 dry roadside positions, stems slightly red retting 4 weeks 3 28 2,64 0,88 3 2,64
4M 1027 dry roadside positions, stems slightly red soaking 3 days 3,5 17 1,66 0,47 5 2,36
5Z 998 1.5 m long, whole green stems, very wet position retting 4 weeks 3 15 1,50 0,50 4 2,00
5R 967 1.5 m long, whole green stems, very wet position retted 4 weeks 3 18 1,86 0,62 4 2,48
5M 1200 1.5 m long, whole green stems, very wet position soaking 3 days – 3,5 21 1,75 0,50 5 2,50
8aR 800 roadside moist positions retting 4 weeks 3 13 1,63 0,54 4 2,17
8aR 700 roadside moist positions retting 5 weeks 2,5 5 0,71 0,29 1 0,29
8aR 1200 roadside moist positions retting 4 weeks 3,5 19 1,58 0,45 4 1,81
8bM 2000 roadside moist positions soaking 4 days  4 26 1,30 0,33 5 1,63
8bM 1200 roadside moist positions soaking 3 days – changed water every day 3 31 2,58 0,86 5 4,31
8cZ 2700 roadside moist positions boiled in ash 2x2hours 4 46 1,70 0,43 4 1,70
9aM 1120 roadside, rather dry positions soaking 3 days – changed water every day 3 9 0,80 0,27 5 1,34
9bM 1280 roadside, rather dry positions soaking 3 days – changed water every day 3,5 12 0,94 0,27 5 1,34
10R 2100 meadow retting 4 weeks 3,5 33 1,57 0,45 5 2,24
11aR 1076 meadow retting 4 weeks 3 19 1,77 0,59 4 2,35
11bR 1920 meadow retting 4 weeks 3 24 1,25 0,42 4 1,67
11cR 2210 meadow retting 3weeks 3,7 13 0,59 0,16 3 0,48
11dR 1779 meadow retting 4 weeks 2,8 22 1,24 0,44 4 1,77
11eR 2580 meadow retting 4 weeks 4 49 1,90 0,47 4 1,90
11fR 1750 meadow retting 4 weeks 2,5 28 1,60 0,64 4 2,56
11gR 3130 meadow retting 4 weeks 3,5 40 1,28 0,37 4 1,46
11hR 2340 meadow retting 4 weeks 3,5 28 1,20 0,34 4 1,37
11iR 1890 meadow retting 4 weeks 2,6 21 1,11 0,43 4 1,71
11Jr 2100 meadow retting 4 weeks 2,6 27 1,29 0,49 4 1,98
11kR 2100 meadow retting 4 weeks 2,6 26 1,24 0,48 4 1,90
12R 1800 meadow retting 4 weeks 2 22 1,22 0,61 4 2,44